The finished Property
In the beginning:
A demising wall for a fire and sound barrier in between two units of a duplex.
Bracing and walk planks.
Close up of an ICF Simpson Strong Tie ready for a floor joist hanger.
The framing is starting now on both sides of the units.
Floor rim joists hung from PolySteel wall with Simpson Ties and 2nd story floor trusses.